Capacity of the Construction Industry
Stephen L. Gruneberg and
Graham J. Ive
Additional contact information
Stephen L. Gruneberg: University College London
Graham J. Ive: University College London
Chapter 7 in The Economics of the Modern Construction Firm, 2000, pp 171-186 from Palgrave Macmillan
Abstract:
Abstract In order to plan and co-ordinate the physical activities and output of industries, planners require volume data, such as technical input per unit of output. For instance, will there be enough bricks to permit a particular volume of construction? If not, can brick industry capacity be increased, or can construction industry demand for bricks be reduced? Even in a capitalist market economy, the need to ask this kind of question is clear, particularly in a relatively closed sector like construction.
Keywords: Construction Industry; Construction Sector; Unit Labour Cost; Spare Capacity; Natural Good (search for similar items in EconPapers)
Date: 2000
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-0-230-51043-2_7
Ordering information: This item can be ordered from
http://www.palgrave.com/9780230510432
DOI: 10.1057/9780230510432_7
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().