EconPapers    
Economics at your fingertips  
 

Waging war

David E. Hawkins and Shan Rajagopal

Chapter Chapter 3 in Sun Tzu and the Project Battleground, 2005, pp 25-37 from Palgrave Macmillan

Abstract: Abstract In the development of projects, time is always a major challenge, not only the time required to complete each project, but also the management of time and resources. The linear extension of time over the life of a project is perhaps the project’s worst enemy. Every project when it is planned is generally based on an optimistic programme, which is often never achieved.

Keywords: Supply Chain; Project Team; Critical Path; Strategic Approach; Project Strategy (search for similar items in EconPapers)
Date: 2005
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-0-230-51061-6_3

Ordering information: This item can be ordered from
http://www.palgrave.com/9780230510616

DOI: 10.1057/9780230510616_3

Access Statistics for this chapter

More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:pal:palchp:978-0-230-51061-6_3