Power in a Flywheel
George L. Roth and
Anthony J. DiBella
Chapter Chapter 6 in Systemic Change Management, 2015, pp 97-109 from Palgrave Macmillan
Abstract:
Abstract An example of implementing sets of complementary changes over time and developing an enterprise can be found in the case of the Warner Robins Air Logistics Center. A group of MIT researchers studied enterprise change at Warner Robins because it was one of the first large air force centers to adopt lean methods in maintenance operations. The results it achieved were note worthy; overall activity levels were extensive and ongoing; it maintained these efforts through successive leadership transitions; and its leaders influenced the adoption of an improvement program across the US Air Force as a whole. What Warner Robins accomplished and how it struggled through those changes illustrates the importance of complementary changes, or what we call installing innovation sets. We examined change efforts in the maintenance program for C-5 and C-130 aircraft, in contracting, and in how change spread across the entire Air Logistics Center.
Keywords: Landing Gear; Enterprise Change; Aircraft Maintenance; Lean Concept; Lean Method (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-137-41202-7_6
Ordering information: This item can be ordered from
http://www.palgrave.com/9781137412027
DOI: 10.1057/9781137412027_6
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().