EconPapers    
Economics at your fingertips  
 

To Buy Or to Build?

Hsien-ch’un Wang ()
Additional contact information
Hsien-ch’un Wang: National Tsing Hua University

Chapter Chapter 6 in Western Technology and China’s Industrial Development, 2022, pp 175-207 from Palgrave Macmillan

Abstract: Abstract Chapter 5 has shown that the technical progress of the Fuzhou Navy Yard slowed down after the late-1880s. A major reason for this was the shortage of funds. Since the mid-1870s, the navy yard had to handle the mounting costs of running the retained steamboats and building new ships with a fix budget. Reduced support limited the scale of facilities upgrade and affected the progress of shipbuilding works. The problem had reached such a point between 1889 and 1894 that it could not launch any shipbuilding project. The problem had much to do with a flawed funding arrangement in a fiscal system that did not see the financial needs for long-term investment in technology. This chapter argues that the weakness of the Qing government’s fiscal system had made it unfit to fund large-scale industrial operations and the government’s shift in policy had exposed such weaknesses that technology transfer was crippled.

Date: 2022
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-137-59813-4_6

Ordering information: This item can be ordered from
http://www.palgrave.com/9781137598134

DOI: 10.1057/978-1-137-59813-4_6

Access Statistics for this chapter

More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:pal:palchp:978-1-137-59813-4_6