Control Systems
Arthur Brearley
Chapter 5 in The Control of Staff-Related Overhead, 1976, pp 52-67 from Palgrave Macmillan
Abstract:
Abstract Clearly, work measurement by itself achieves nothing and the only value of administrative work measurement depends on positive use being made of the measurement standards. That use can be to achieve control of clerical cost. We can suggest therefore that control in this area normally has one overall fundamental objective, namely action by management to achieve and maintain higher productivity and lower cost in matters relating to white-collar operations.
Keywords: Work Load; Supervisory Control; Management Control System; Accounting Period; Work Measurement (search for similar items in EconPapers)
Date: 1976
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-02664-7_5
Ordering information: This item can be ordered from
http://www.palgrave.com/9781349026647
DOI: 10.1007/978-1-349-02664-7_5
Access Statistics for this chapter
More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().