EconPapers    
Economics at your fingertips  
 

Introducing the EPP house (topological space) method to solve MRP problems

Balázs Gyenge, László Kasza and László Vasa

PLOS ONE, 2021, vol. 16, issue 6, 1-20

Abstract: The problem of product and process planning analysed so far is how we can take advantage of our strategy in planning. Among the principles of manufacturing and service management concepts is that after planning demand, planning transformation is one of the key steps of integrated efficiency; it makes it possible to save costs that are not value adding and are not necessary from the customer’s point of view. Currently, the methods of material requirements and capacity planning can be seen as classic solutions that are based on dependency relations between different resources, which can be dynamic in space and time. Measuring and recording capacities raise several problems in addition to the fact that our planning methods are not always satisfying. In the literature, the methods of material requirements planning or manufacturing resource planning (MRP) are not typically optimization methods, so they do not guarantee the best solution, and even if our planning methods were satisfying, several manufacturing restrictions (the time allowed, the complexity of the planning process, the lack of testing opportunities, etc.) could prevent us from reaching satisfying application. It is necessary to create a simple planning algorithm that can give the planner a greater degree of freedom and that would be simple and algorithmic in order to maintain continuous conscious control, putting an end to planning uncertainty and leading us to the best solution under the given conditions. The aim of our research is to introduce a novel, simple planning algorithm, similar to heuristic methods that eliminates the problem of defining the order quantity when applying traditional methods, which prevents us from determining in advance which method is desirable (causing unnecessary planning steps); computer-based solutions hide the causal relations of the methodology from the planner (causing unreliability uncertainty).

Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0253330 (text/html)
https://journals.plos.org/plosone/article/file?id= ... 53330&type=printable (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:plo:pone00:0253330

DOI: 10.1371/journal.pone.0253330

Access Statistics for this article

More articles in PLOS ONE from Public Library of Science
Bibliographic data for series maintained by plosone ().

 
Page updated 2025-03-19
Handle: RePEc:plo:pone00:0253330