Impact of Reserve and Fixed Costs on the Day-Ahead Scheduling Problem in Greece’s Electricity Market
Panagiotis Andrianesis,
George Liberopoulos,
Kostis Sakellaris and
Andreas Vlachos
MPRA Paper from University Library of Munich, Germany
Abstract:
We sketch the main aspects of Greece’s electricity system from a market-based point of view. First, we provide data concerning the mix of generating units, the system load and the frequency-related ancillary services. Then, we formulate a simplified model of Greece’s Day-Ahead Scheduling (DAS) problem that constitutes the basis for our analysis. We examine various cases concerning the format of the objective function as well as the pricing and compensation schemes. An illustrative example is used to indicate the impact of reserve and fixed (start-up, shut-down, and minimum-load) costs on the resulting dispatching of units and on clearing prices, under the different cases. Our analysis aims at unveiling the impact of cost components other than energy offers on the DAS problem, and provide the grounds for future research on the design of the electricity market.
Keywords: Electricity Market; Day-Ahead Scheduling (search for similar items in EconPapers)
JEL-codes: C61 L94 (search for similar items in EconPapers)
Date: 2008-10-03
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/21426/1/MPRA_paper_21426.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:21426
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().