Analysis of the application of value engineering in the building construction project of State Elementary School 1 Padang Sambian

Ronaldi Matung (), I Nyoman Indra Kumara (), Decky Cipta Indrashwara () and Dewa Ayu Trisna Adhiswari Wedagama ()
Additional contact information
Ronaldi Matung: Universitas Pendidikan Nasional
I Nyoman Indra Kumara: Universitas Pendidikan Nasional
Decky Cipta Indrashwara: Universitas Pendidikan Nasional
Dewa Ayu Trisna Adhiswari Wedagama: Universitas Pendidikan Nasional

Priviet Social Sciences Journal, 2026, vol. 6, issue 3, 65-81

Abstract: Cost efficiency is an important aspect of project planning. One common approach to increasing cost efficiency is value engineering. This study applies Value Engineering to the Padang Sambian 1 Public Elementary School Building Construction Project with a total planned budget of IDR. 10,019,488,000.00. The analysis was conducted using the Dell'Isola method, which consists of four stages: information, creative, analytical, and recommendation. Based on the results of the study, the items carried out by Value Engineering include concrete work items on floors 1, 2, 3 and the roof, wooden plank truss work and roof tiles (roof work), door window hanging and locking work on floors 1, 2, and 3, masonry and plastering work (wall work) on floors 1, 2, and 3, paving block installation, ceramic floor and wall installation on floors 1, 2, and 3, and ceiling work on floor 3. The cost efficiency obtained using the Dell’Isola theory value engineering method is IDR. 224,566,091.39 or 2.24% of the total project cost with details of savings of IDR. 69,226,207.23 on concrete work on floors 1, 2, 3, and roof, IDR. 58,015,626.87 on truss work, wooden planks and roof tiles (roof work), IDR. 6,890,888.88 on door and window hanging and locking work on floors 1, 2, and 3, IDR. 1,160,097.63 on masonry and plastering work (wall work) on floors 1, 2, and 3, IDR. 48,561,507.2 on paving block masonry, IDR. 18,528,260.2 on ceramic floor and wall masonry on floors 1, 2, and 3, and IDR. 22,183,503.3 on the 3rd floor ceiling work. The benefits of applying value engineering are that it can reduce project costs without reducing the function, quality, and performance of the building, while providing a more efficient technical basis for decision-making at the planning and construction implementation stages.

Keywords: cost efficiency; Dell’Isola; value engineering (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:

Downloads: (external link)
https://journal.privietlab.org/download.php?id=12792 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:prv:pssjpv:1258

Ordering information: This journal article can be ordered from
https://journal.priv ... SJ/article/view/1258

DOI: 10.55942/pssj.v6i3.1258

Access Statistics for this article

More articles in Priviet Social Sciences Journal from Privietlab Research Center
Bibliographic data for series maintained by Mochammad Fahlevi ().

 
Page updated 2026-09-26
Handle: RePEc:prv:pssjpv:1258