Grid Connection Costs as a Barrier to Building New Generation: Evidence and Implications for Transmission Policy

Sarah Johnston, Yifei Liu and Chenyu Yang

No 25-21, RFF Working Paper Series from Resources for the Future

Abstract: Meeting projected growth in electricity demand and climate goals will require building new electricity generators. The grid connection process is seen as a key constraint on this development. We collect new data on grid connection costs for PJM, the largest regional grid operator in the United States. We geographically match these costs to transmission spending to study their determinants. Using regression analysis, we find that these costs, and especially the network upgrade portion, are difficult to predict: generators with similar characteristics can have very different costs. We also find that planned generators with high network upgrade costs are much more likely to be canceled. Finally, prior transmission spending by the grid operator is associated with lower network upgrade costs for connecting generators. These findings emphasize the critical role of transmission capacity in expanding electricity generation capacity.

Date: 2025-09-23
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.rff.org/documents/5002/WP_25-21.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rff:dpaper:dp-25-21

Access Statistics for this paper

More papers in RFF Working Paper Series from Resources for the Future Contact information at EDIRC.
Bibliographic data for series maintained by Resources for the Future ().

 
Page updated 2025-09-30
Handle: RePEc:rff:dpaper:dp-25-21