RISKS AND ADVANTAGES OF THE RESOURCE PRICING METHOD IN CONSTRUCTION
РИСКИ И ПРЕИМУЩЕСТВА РЕСУРСНОГО МЕТОДА ЦЕНООБРАЗОВАНИЯ В СТРОИТЕЛЬСТВЕ
Bokachev Roman (Бокачев Р.А.),
Stupnikova Elena (Ступникова Е.А.) and
Olenina Olga (Оленина О.А.)
Additional contact information
Bokachev Roman (Бокачев Р.А.): PJSC «MMC «NORILSK NICKEL»
Stupnikova Elena (Ступникова Е.А.): Russian University of transport (MIIT)
Olenina Olga (Оленина О.А.): Russian University of transport (MIIT)
State and Municipal Management Scholar Notes, 2020, vol. 4, 72-76
Abstract:
This article identifies and analyzes the risks of using the resource pricing method in construction in comparison with the base-index method, and also shows its advantages. The studies were carried out on the basis of the analysis of the formation of the estimated cost of PJSC Gazprom facilities.
Keywords: reform of estimated pricing; estimated and normative pricing base in construction; resource pricing method (search for similar items in EconPapers)
Date: 2020
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://repec.ranepa.ru/rnp/smmscn/s20410.pdf
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rnp:smmscn:s20410
Access Statistics for this article
State and Municipal Management Scholar Notes is currently edited by Tatiana Ignatova
More articles in State and Municipal Management Scholar Notes from Russian Presidential Academy of National Economy and Public Administration Contact information at EDIRC.
Bibliographic data for series maintained by RANEPA maintainer ().