ALGORITHM FOR REDUCING THE RISK FACTORS OF TEMPORARY BRIDGE CONSTRUCTION PROJECTS BASED ON THEIR ASSESSMENT
АЛГОРИТМ СНИЖЕНИЯ ФАКТОРОВ РИСКА ПРОЕКТОВ СТРОИТЕЛЬСТВА ВРЕМЕННЫХ МОСТОВ НА ОСНОВЕ ИХ ОЦЕНКИ
Fan Van Chuen (Фан Ван Чуен) and
Kapustina Nadezhda (Капустина Н.В.)
Additional contact information
Fan Van Chuen (Фан Ван Чуен): Russian University of Transport
Kapustina Nadezhda (Капустина Н.В.): Russian University of Transport
State and Municipal Management Scholar Notes, 2020, vol. 4, 168-171
Abstract:
The paper considers approaches to risk management of construction projects for the construction of temporary bridges for the period of repair and reconstruction of permanent ones based on their assessment. The study used expert indicators of the limit values of risk factors for the construction of a temporary bridge for Vietnamese conditions, and compared the accepted indicators for Vietnamese conditions with similar indicators for Russian conditions. Based on the conducted research, an algorithm for reducing the risk factors of the project under study was also proposed.
Keywords: construction project; temporary bridge structures; expert assessment method; risk factor management algorithm (search for similar items in EconPapers)
Date: 2020
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
https://repec.ranepa.ru/rnp/smmscn/s20427.pdf
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:rnp:smmscn:s20427
Access Statistics for this article
State and Municipal Management Scholar Notes is currently edited by Tatiana Ignatova
More articles in State and Municipal Management Scholar Notes from Russian Presidential Academy of National Economy and Public Administration Contact information at EDIRC.
Bibliographic data for series maintained by RANEPA maintainer ().