Locational Investment Signals: How to Steer the Siting of New Generation Capacity in Power Systems?

Anselm Eicke, Tarun Khanna and Lion Hirth

The Energy Journal, 2020, vol. 41, issue 6, 281-304

Abstract: New generators located far from consumption centers require transmission infrastructure and increase network losses. The primary objective of this paper is to study signals that affect the location of generation investment. Such signals result from the electricity market itself and from additional regulatory instruments. We cluster them into five groups: locational electricity markets, deep grid connection charges, grid usage charges, capacity mechanisms, and renewable energy support schemes. We review the use of instruments in twelve major power systems and discuss relevant properties, including a quantitative estimate of their strength. We find that most systems use multiple instruments in parallel, and none of the identified instruments prevails. The signals vary between locations by up to 20 EUR per MWh. Such a difference is significant when compared to the levelized costs of combined cycle plants of 64-72 EUR per MWh in Europe.

Keywords: Electricity markets; Locational signal; Generation investment; Market regulation; Incentive regulation (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
https://journals.sagepub.com/doi/10.5547/01956574.41.6.aeic (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:sae:enejou:v:41:y:2020:i:6:p:281-304

DOI: 10.5547/01956574.41.6.aeic

Access Statistics for this article

More articles in The Energy Journal
Bibliographic data for series maintained by SAGE Publications ().

 
Page updated 2025-03-19
Handle: RePEc:sae:enejou:v:41:y:2020:i:6:p:281-304