Can Measurement Error Explain the Weakness of Productivity Growth in the Canadian Construction Industry?
Peter Harrison
International Productivity Monitor, 2007, vol. 14, 53-70
Abstract:
According to Statistics Canada productivity estimates, the rate of growth of real output per
Keywords: Real labour productivity; Construction industry; Business sector; Input cost indexes; Measurement error; Productivity gap. (search for similar items in EconPapers)
JEL-codes: C40 C80 C82 L74 O40 O51 (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://csls.ca/ipm-archive/ipm-issue-14/can-measu ... nstruction-industry/ Abstract page (English and French) (text/html)
https://csls.ca/wp-content/uploads/2026/07/IPM-Issue-14-4-Harrison.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sls:ipmsls:v:14:y:2007:4
Ordering information: This journal article can be ordered from
http://www.csls.ca
Access Statistics for this article
International Productivity Monitor is currently edited by Stephen Tapp
More articles in International Productivity Monitor from Centre for the Study of Living Standards 170 Laurier Ave. W, Suite 604, Ottawa, ON K1P 5V5. Contact information at EDIRC.
Bibliographic data for series maintained by CSLS ().