EconPapers    
Economics at your fingertips  
 

Challenges of Time Management Among Employees in Hungary: A Correlational and Impact-Effort Matrix Approach

Norbert Feher ()
Additional contact information
Norbert Feher: University of Pannonia, SzEEDSM (Doctoral Program in Business Administration Sciences), Széchenyi István University

A chapter in Proceedings of the Kautz Conference on Business and Economics 2025 (KCBE 2025), 2026, pp 96-119 from Springer

Abstract: Abstract This mixed-methods study examines time management challenges and techniques among employees in Hungary, with a particular focus on mid-level managers in multinational corporations. A questionnaire survey of 345 employees identified eight prevalent time management problems—including procrastination, meeting overload, frequent interruptions, email and chat overload, and multitasking—and tested their association with organizational context using chi-square analysis. To identify potential remedies, a systematic content analysis of 49 peer-reviewed and practitioner business publications was conducted, yielding 12 frequently recommended time management techniques. These challenges and techniques were linked in a correlational matrix and prioritized using an Impact–Effort Matrix that combined perceived effectiveness with implementation effort. The findings indicate that techniques such as delegation, the Eisenhower Matrix, task batching, and the Pareto principle offer the most favorable balance between impact and feasibility, yet overall awareness and regular application of structured time management methods remain low among mid-level managers. The study closes an empirical gap by jointly analyzing time management challenges and techniques in a Central and Eastern European setting and provides an evidence-based framework for selecting interventions. The results have practical implications for managers, HR professionals, organizational developers and continuous improvement specialists, including Lean Six Sigma practitioners, who must navigate constant urgent demands while protecting time for high-impact improvement work within the human-centric, Industry 5.0 context.

Keywords: Continuous Improvement; Impact–Effort Matrix; Mid-level Managers; Time Management; Workplace Productivity (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:advbcp:978-94-6239-658-6_6

Ordering information: This item can be ordered from
http://www.springer.com/9789462396586

DOI: 10.2991/978-94-6239-658-6_6

Access Statistics for this chapter

More chapters in Advances in Economics, Business and Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-07-24
Handle: RePEc:spr:advbcp:978-94-6239-658-6_6