Research on Construction and Scheduling of Seru Considering Worker Flexibility
WenMin Han,
WanJin Si () and
Yang Liu
Additional contact information
WenMin Han: Jiangsu University of Science and Technology, School of Economics and Management
WanJin Si: Jiangsu University of Science and Technology, School of Economics and Management
Yang Liu: Jiangsu University of Science and Technology, School of Economics and Management
A chapter in Proceedings of the 2023 3rd International Conference on Enterprise Management and Economic Development (ICEMED 2023), 2023, pp 111-119 from Springer
Abstract:
Abstract Seru have gradually become the production method to cope with multi-variety and small-lot demands due to their high productivity and flexibility, and the allocation of tasks, equipment and workers are the key decisions in the construction and scheduling of Seru. In this paper, an optimization model with the objectives of minimizing the maximum completion time and workload balance among workers is established and solved by the improved NSGA-II algorithm, and finally the effectiveness of the model and algorithm is verified by numerical examples.
Keywords: Seru construction and scheduling; Worker flexibility; Workload balance; NSGA-II (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:advbcp:978-94-6463-224-8_17
Ordering information: This item can be ordered from
http://www.springer.com/9789464632248
DOI: 10.2991/978-94-6463-224-8_17
Access Statistics for this chapter
More chapters in Advances in Economics, Business and Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().