Analysis of Operation Cost and Control of Communication Operator Data Center Park
Pengfei Zhao (),
Chang Liu and
Jingtao Cheng
Additional contact information
Pengfei Zhao: China Information Consulting & Designing Institute Co., Ltd
Chang Liu: China Information Consulting & Designing Institute Co., Ltd
Jingtao Cheng: China Information Consulting & Designing Institute Co., Ltd
A chapter in Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023), 2024, pp 277-285 from Springer
Abstract:
Abstract This paper focuses on the operating costs of the data center. Firstly, the calculation model of the operation cost is proposed for the construction and operation conditions of the data center, which can provide the calculation method for the feasibility study of the data center projects. Secondly, it gives suggestions to reduce operating costs from various perspectives.
Keywords: Data center; Operating costs; Power cost; Water bill; Labor cost (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:advbcp:978-94-6463-256-9_29
Ordering information: This item can be ordered from
http://www.springer.com/9789464632569
DOI: 10.2991/978-94-6463-256-9_29
Access Statistics for this chapter
More chapters in Advances in Economics, Business and Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().