Study on the Index System of Military Capital Construction Financial Risk Early Warning
An Liao (),
Yan Peng and
Ni Ni
Additional contact information
An Liao: Naval University of Engineering, College of Electrical Engineering
Yan Peng: Naval University of Engineering, College of Electrical Engineering
Ni Ni: Wuhan College, School of Accounting
A chapter in Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023), 2024, pp 616-628 from Springer
Abstract:
Abstract To construct a scientific index system of military capital construction financial risk early warning is an important advance to implement financial risk early warning. This paper establishes corresponding indicators from four aspects of project management risk, capital risk, cost control risk and internal control risk, and quantifies indicators at all levels, and uses analytic hierarchy process to determine the weight of indicators at all levels, to ensure the scientific index system, and has strong practicability for the implementation of financial risk early warning.
Keywords: Military infrastructure; Index system; Analytic hierarchy process (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:advbcp:978-94-6463-256-9_63
Ordering information: This item can be ordered from
http://www.springer.com/9789464632569
DOI: 10.2991/978-94-6463-256-9_63
Access Statistics for this chapter
More chapters in Advances in Economics, Business and Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().