A multi-period closed-loop supply chain network design with circular route planning
Shuihua Han (),
Yudi Mo (),
Linlin Chen (),
Zongwei Luo (),
Cyril R. H. Foropon () and
H. M. Belal ()
Additional contact information
Shuihua Han: Xiamen University
Yudi Mo: Xiamen University
Linlin Chen: Xiamen University
Zongwei Luo: BNU-UIC Institute of AI and Future Networks, Bejing Normal University
Cyril R. H. Foropon: Montpellier Business School Montpellier
H. M. Belal: Liverpool John Moores University Liverpool
Annals of Operations Research, 2025, vol. 348, issue 3, No 5, 1195-1233
Abstract:
Abstract The routing problem is a critical issue in closed-loop supply chain neatwork design, but it is typically simplified in the literature. In contrast to the traditional approach of a point-to-point delivery between two logistics nodes or a routing problem at the terminal distribution stage in a closed-loop supply chain (CLSC), we propose a multi-period CLSC network that considers circular routing in the network’s echelons to reduce empty running. First, we formulate reversible transportation mechanism (RTM) and circular transportation mechanism (CTM), and construct two CLSC network models for a three-echelon supply chain network respectively. The models fully consider backorders, delayed returns, delivery lead time, and carbon emissions cost into the model. Second, a heuristic method with initialization and improvement stages is proposed to tackle the large-scale NP-hard problems, and the local search process is guided via simulated annealing. Third, the model and solution are applied to the real-life case of a toy manufacturer in China. The results show that: compared to RTM, CTM can effectively improve the utilisation of transport vehicles and reduce the number of transport vehicles used in the network; the network operating cost of CTM is significantly less than that of RTM; no matter how the carbon tax on emission will be, the average carbon emission will be reduced under CTM as compared to RTM; the heuristic algorithm we design can efficiently solve large-scale CLSC design problems under both transport mechanisms.
Keywords: Supply Chain Management (T); Closed-loop supply chain network design; Circular transportation mechanism; Routing optimization; Carbon emissions (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s10479-022-04848-4 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:annopr:v:348:y:2025:i:3:d:10.1007_s10479-022-04848-4
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10479
DOI: 10.1007/s10479-022-04848-4
Access Statistics for this article
Annals of Operations Research is currently edited by Endre Boros
More articles in Annals of Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().