Life-cycle sustainability risk management a multi-stakeholder approach: the case of Damascus post-war residential projects
Lina Adib Khaddour ()
Additional contact information
Lina Adib Khaddour: Nottingham Trent University
Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, 2022, vol. 24, issue 11, No 11, 12756-12786
Abstract:
Abstract Post-war Residential Re-construction Projects (PRRP) are widely complex and have significant risks. It is necessary to address sustainability risks in PRRP in order to respond to the war disastrous consequences. Thus, reducing sustainability risks associated with PRRP Life Cycle (LC) phases is of absolute importance for each stakeholder to achieve sustainability within PRRP process and performance. How to effectively get different participants to manage risks in the context of PRRP LC is decisive to the project sustainability objectives. This study aims to identify how sustainability risk factors change during PRRP LC phases and how LC Sustainability Risk Management (LCSRM) is perceived by PRRP primary stakeholders. Data were collected through survey and interviews with different stakeholder groups in Damascus PRRP. The findings revealed the top five risks of: ‘Poor constructability’ (with a score of 0.44 at the construction phase), ‘Delays due to poor contract management’ (with a score of 0.44 at the pre-construction phase), ‘Lack of availability of green materials and equipment’ (with a score of 0.43 at the construction phase), ‘Pollution’ (with a score of 0.4 at the construction phase) and ‘Being fined for failing to meet the project objectives’ (with a score of 0.36 at the construction phase). The majority of risk responses were found to be more effective in the planning, design, pre-construction and construction stages. LCSRM is presented in a participatory manner involving key stakeholders. Practical recommendations for developer, consultants, designers, contractors, project managers and regulators were presented. The study’s LCSRM approach offers stakeholders a novel approach to customize their own list of sustainability risks. The main benefit of LCSRM is in shifting construction management control from input oriented to a more output oriented one in order to respond to unforeseen risks encompassing PRRP performance, which often deviated PRRP sustainability objectives from reality.
Keywords: Sustainability risk management; Life cycle; Reconstruction; Stakeholders; Syria; Build back better (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1007/s10668-021-01963-3 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:endesu:v:24:y:2022:i:11:d:10.1007_s10668-021-01963-3
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/10668
DOI: 10.1007/s10668-021-01963-3
Access Statistics for this article
Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development is currently edited by Luc Hens
More articles in Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().