Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
Zikai Zhang () and
Qiuhua Tang ()
Additional contact information
Zikai Zhang: Wuhan University of Science and Technology
Qiuhua Tang: Wuhan University of Science and Technology
Flexible Services and Manufacturing Journal, 2022, vol. 34, issue 1, No 6, 156-203
Abstract:
Abstract In this paper, flexible preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m dedicated machines in the fabrication stage and one machine in the assembly stage. The operational status of each machine is described by a continuous variable, maintenance level. The maintenance level value is inversely proportional to the processing time. Once a PM activity is performed, this value will return to the initial value. Different from the PM at fixed predefined time intervals, flexible PM can be carried out at any time point, but the maintenance levels are not less than 0. Hence, a MILP model with maintenance level constraints is formulated to minimize the total completion time and maintenance time. Regarding the methods, a latest PM decision strategy is proposed to determine the execution time of PM activities. This new strategy is embedded into 15 constructive heuristics and 7 meta-heuristics (three variants of iterated local search, three variants of Q-learning-based ant colony system with local search and a Q-learning-based hyper-heuristics) to address this new problem. The final experimental analysis demonstrates the significance of the integrated model and the effectiveness of the proposed constructive heuristics and meta-heuristics.
Keywords: Assembly flow shop; Preventive maintenance; Constructive heuristic; Meta-heuristic; Q-learning (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://link.springer.com/10.1007/s10696-021-09403-0 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:flsman:v:34:y:2022:i:1:d:10.1007_s10696-021-09403-0
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10696
DOI: 10.1007/s10696-021-09403-0
Access Statistics for this article
Flexible Services and Manufacturing Journal is currently edited by Hans Günther
More articles in Flexible Services and Manufacturing Journal from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().