Shifts, Types, and Generation Schemes for Project Schedules
Rainer Kolisch ()
Additional contact information
Rainer Kolisch: Technische Universität München
Chapter Chapter 1 in Handbook on Project Management and Scheduling Vol.1, 2015, pp 3-16 from Springer
Abstract:
Abstract Schedule generation schemes are the backbone of heuristics to solve project scheduling problems. In this chapter we introduce the two schedule generation schemes for the classical resource constrained project scheduling problem, the serial and the parallel schedule generation scheme. We characterize them according to the types of schedule they generate and discuss variants of the schedule generation schemes in order to deal with extensions such as general precedence constraints and stochastic activity durations.
Keywords: Makespan minimization; Project scheduling; Resource constraints; Schedule generation schemes (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ihichp:978-3-319-05443-8_1
Ordering information: This item can be ordered from
http://www.springer.com/9783319054438
DOI: 10.1007/978-3-319-05443-8_1
Access Statistics for this chapter
More chapters in International Handbooks on Information Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().