Lower Bounds on the Minimum Project Duration
Sigrid Knust ()
Additional contact information
Sigrid Knust: University of Osnabrück
Chapter Chapter 3 in Handbook on Project Management and Scheduling Vol.1, 2015, pp 43-55 from Springer
Abstract:
Abstract In this chapter methods to calculate lower bounds on the minimum project duration (i.e. the makespan C max ) of the basic resource-constrained project scheduling problem P S ∣ p r e c ∣ C m a x $$\mathit{PS}\,\mid \,\mathit{prec}\,\mid \,C_{\mathit{max}}$$ are presented. We distinguish between constructive and destructive lower bounds.
Keywords: Lower bounds; Makespan minimization; Project scheduling; Resource constraints (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (2)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ihichp:978-3-319-05443-8_3
Ordering information: This item can be ordered from
http://www.springer.com/9783319054438
DOI: 10.1007/978-3-319-05443-8_3
Access Statistics for this chapter
More chapters in International Handbooks on Information Systems from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().