A performance-driven framework with a system-of-systems approach for augmented asset management of railway system
Jaya Kumari (),
Ramin Karim (),
Pierre Dersin () and
Adithya Thaduri ()
Additional contact information
Jaya Kumari: Luleå University of Technology
Ramin Karim: Luleå University of Technology
Pierre Dersin: Luleå University of Technology
Adithya Thaduri: Scania Industrial Maintenance AB
International Journal of System Assurance Engineering and Management, 2024, vol. 15, issue 8, No 31, 3988-4002
Abstract:
Abstract The railway system is a complex technical system-of-systems (SoS). To address the complexity of the railway system, a holistic approach is needed that facilitates the development of an appropriate asset management regime. A systems-of-systems (SoS) approach considers the complex nature of the railway system, comprising interconnected subsystems like rolling stock and infrastructure. Neglecting these interdependencies risks sub-optimization of the overall system performance. Asset management of the railway system utilising a SoS approach ensures the focus of asset management on overall system requirements. The efficiency and effectiveness of the railway system is based on aspects such as availability, reliability, and safety performance. To enhance these aspects, monitoring, and improvement of key performance indicators (KPIs) emphasizing increased capacity and reduced operational costs is essential. The KPIs offer quantifiable parameters for performance optimization. Augmenting asset management through data-driven technologies can improve the efficiency and effectiveness of asset management. However, challenges persist in the implementation of data-driven solutions due to the railway system’s complexity and lack of a holistic perspective. A systematic performance-driven framework with a system-of-systems approach for augmented asset management of railway system provides handrail for the utilisation of data-driven technologies with railway system requirements at the centre while developing an asset management regime. The proposed framework aims to establish a clear relationship between system KPIs, and the performance of sub-systems and components aiding railway organizations in asset management design and implementation. This paper explains the important components of the proposed framework and demonstrates the application the framework for asset management and maintenance planning of high value components in the fleet of railway rolling stock. Adoption of the proposed framework is expected to enhance asset management through development and implementation of data-driven solutions that are aligned with system KPIs, to support asset management decision making.
Keywords: Asset management; Maintenance; System-of-systems; Key performance indicators; Railway; Rolling stock (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s13198-024-02404-w Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ijsaem:v:15:y:2024:i:8:d:10.1007_s13198-024-02404-w
Ordering information: This journal article can be ordered from
http://www.springer.com/engineering/journal/13198
DOI: 10.1007/s13198-024-02404-w
Access Statistics for this article
International Journal of System Assurance Engineering and Management is currently edited by P.K. Kapur, A.K. Verma and U. Kumar
More articles in International Journal of System Assurance Engineering and Management from Springer, The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().