Technology Assessment: Washington Public Power Supply System (WPPSS)
Nasir Sheikh ()
Additional contact information
Nasir Sheikh: The State University of New York
Chapter Chapter 3 in Hierarchical Decision Modeling, 2016, pp 45-60 from Springer
Abstract:
Abstract The Washington Public Power Supply System (WPPSS) is remembered as the largest bond default in the history of the USA. WPPSS was an ambitious program for the construction of multiple nuclear power plants to augment hydroelectric power and instead became known as the WPPSS (or “Woops”) debacle. WPPSS was started as a small municipal corporation in the mid-1950s to meet future electric power needs of the residential, industrial, and commercial sectors in the Northwest region of the United States. The WPPSS charter was to enable electric public utilities to combine their resources to build large power generation plants and benefit from economies of scale. WPPSS initially consisted of 17 utilities including Seattle City Light, Washington State’s largest public utility.
Keywords: Nuclear Power Plant; Desirability Function; Hydroelectric Power; Energy Planning; Cost Mitigation (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:innchp:978-3-319-18558-3_3
Ordering information: This item can be ordered from
http://www.springer.com/9783319185583
DOI: 10.1007/978-3-319-18558-3_3
Access Statistics for this chapter
More chapters in Innovation, Technology, and Knowledge Management from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().