The Scientific Problems with the Mega Infrastructure Construction Management Theory
Zhaohan Sheng
Additional contact information
Zhaohan Sheng: Nanjing University
Chapter Chapter 7 in Fundamental Theories of Mega Infrastructure Construction Management, 2018, pp 185-352 from Springer
Abstract:
Abstract The general connotation and significance of the scientific problems associated with the theory system have been elaborated in Sect. 4.4 . Now, based on the core concepts and rationales discussed in Chaps. 5 and 6 , we employ the core concepts and make deductions based on the explicit rationales to identify the academic scientific problems and their theoretical values with respect to the mega infrastructure construction management theory. Although this is only a tentative exploration of the building of scientific problems in the mega infrastructure construction management theory system, its significance is far more important because only after the establishment of the complete logic chain, i.e., core concepts—rationales—scientific problems, can the mega infrastructure construction management theory system be perceived as generally normative and complete.
Date: 2018
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-3-319-61974-3_7
Ordering information: This item can be ordered from
http://www.springer.com/9783319619743
DOI: 10.1007/978-3-319-61974-3_7
Access Statistics for this chapter
More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().