ERP-Planning Garbage: Realizing and Preventing
Karlheinz Haberlandt ()
Additional contact information
Karlheinz Haberlandt: Heilbronn University
A chapter in Innovation and Future of Enterprise Information Systems, 2013, pp 31-51 from Springer
Abstract:
Abstract MRP II is still the planning core of most ERP-software systems and practically usage with well known but often ignored weaknesses. These weaknesses and their reasons are described in detail. Most APS are concentrated only on partial planning aspects with insufficient results. Until now all well known OR methods prove as unsuitable to solve the high complex planning ERP tasks for practical use. Rolling Detail Planning (RDP) is an approach, which changes fundamentally ERP-MRP II philosophy. TPS is an innovative alternative software system based on simulation techniques and fuzzy logic by realizing RDP. It claims to avoid the faults of MRP II based software systems and to get over the weaknesses in calculation, concepts, transparency, and cost of OR based APS.
Keywords: ERP; MRP; MRP II; Material planning; Capacity planning; Master plan; Material requirements scheduling; Rolling detail planning (RDP); Lot Sizing; Manufacturing; Total Planning System (TPS) (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnichp:978-3-642-37021-2_5
Ordering information: This item can be ordered from
http://www.springer.com/9783642370212
DOI: 10.1007/978-3-642-37021-2_5
Access Statistics for this chapter
More chapters in Lecture Notes in Information Systems and Organization from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().