Research on Critical Chain Project Buffer Management Considering Activity Risk

Meng Xiao and Yanfeng Chu ()
Additional contact information
Meng Xiao: Nanjing University of Aeronautics and Astronautics
Yanfeng Chu: Nanjing University of Aeronautics and Astronautics

Chapter Chapter 25 in City, Society, and Digital Transformation, 2022, pp 331-344 from Springer

Abstract: Abstract Critical chain project management is a widely used project schedule management method, the core of which is buffer management. We firstly determine the buffer based on the elasticity of project activities, consider the activity risk when allocating the buffer, then set the buffer monitoring warning points, and give the implementation scheme of dynamic buffer monitoring. Finally, a case simulation demonstrates the effectiveness of the proposed buffer management method in the project schedule monitoring process.

Keywords: Critical chain; Buffer sizing; Activity risk; Buffer monitoring (search for similar items in EconPapers)
Date: 2022
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-3-031-15644-1_25

Ordering information: This item can be ordered from
http://www.springer.com/9783031156441

DOI: 10.1007/978-3-031-15644-1_25

Access Statistics for this chapter

More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-06-15
Handle: RePEc:spr:lnopch:978-3-031-15644-1_25