Evaluation of Influencing Factors of Construction Cost Control Based on Intelligent Construction Site
Baolin Duan (),
Yebing Wang (),
Guangjie Liu (),
Weixiao Wang and
Xuelei Zhou
Additional contact information
Baolin Duan: School of Changchun Institute of Technology
Yebing Wang: School of Changchun Institute of Technology
Guangjie Liu: School of Changchun Institute of Technology
Weixiao Wang: School of Changchun Institute of Technology
Xuelei Zhou: School of Changchun Institute of Technology
Chapter Chapter 31 in Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate, 2024, pp 441-453 from Springer
Abstract:
Abstract With the rapid development of information technology in China’s construction industry, intelligent construction sites emerge. The State has issued a series of policies emphasizing on vigorously promoting research and development, manufacturing and application of advanced manufacturing equipment, intelligent equipment and related equipment on smart sites. On the basis of smart site, this paper takes influencing factors of project cost control as research object, carries out a lot of literature reading and field investigation, sorts out 20 representative influencing factors, invites experts to score each factor by Delphi method, and calculates weights of influencing factors by ISM-AHP method. The analysis shows that project management experience and system, the proportion of training fee for smart site personnel to total cost are the deepest factors affecting the cost control of smart site. Material utilization ratio, real-name passage fee to total cost ratio and enterprise management fee to total cost ratio are the most direct and most important factors affecting the cost control of smart site. An example is given to verify the feasibility and reliability of the model. Finally, based on the results of the study, reasonable and effective cost control measures and suggestions are put forward to provide reference for the development of smart sites, so as to improve the progress and quality of the project.
Keywords: Smart site; Cost control; Analytic hierarchy process; Interpretative structural modeling method (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-1949-5_31
Ordering information: This item can be ordered from
http://www.springer.com/9789819719495
DOI: 10.1007/978-981-97-1949-5_31
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().