Research on the Theory of IoT-Based Prefabricated Building Component Installation and Positioning System
Zeng Jia (),
Clyde Zhengdao Li (),
Li Shuo,
Gao Tian Liang,
Liu Xin Yu,
Deng Yi Qian and
Liu Jun Lin
Additional contact information
Zeng Jia: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Clyde Zhengdao Li: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Li Shuo: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Gao Tian Liang: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Liu Xin Yu: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Deng Yi Qian: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Liu Jun Lin: Sino-Australia Joint Research Center in BIM and Smart Construction, College of Civil and Transportation Engineering, Shenzhen University
Chapter Chapter 66 in Proceedings of the 28th International Symposium on Advancement of Construction Management and Real Estate, 2024, pp 973-987 from Springer
Abstract:
Abstract The effective and timely management of component information is essential for the smooth running of construction projects. Especially at the phase of development of construction industrialization, the project form of organization, planning, supervision, collaboration, and communication should be conducive to the construction project. Timely and effective management of component information is a fundamental requirement for the development of prefabricated buildings. Tracking accurately and location of components precisely are good for managing the entire process of prefabricated buildings. Component tracking and positioning is a dynamic process that is closely related to the content of each phase of work. Therefore, based on the in-depth understanding of the construction process of prefabricated buildings, the paper analyzes and summarizes the spatial information of components needed for each stage of work, combining BIM technology and RFID technology, using digital measurement technology and positioning identification technology to establish an IoT-based inspection system for the installation and positioning of assembly building components to meet the requirements of whole life cycle component tracking and positioning.
Keywords: Prefabricated buildings; Internet of things (IoT); Component installation and positioning; Building information model (BIM) (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:lnopch:978-981-97-1949-5_67
Ordering information: This item can be ordered from
http://www.springer.com/9789819719495
DOI: 10.1007/978-981-97-1949-5_67
Access Statistics for this chapter
More chapters in Lecture Notes in Operations Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().