On polynomial solvability of two multiprocessor scheduling problems
Eberhard Girlich and
Alexander G. Tarnowski
Mathematical Methods of Operations Research, 1999, vol. 50, issue 1, 27-51
Abstract:
We discuss a new approach for solving multiprocessor scheduling problems by using and improving results for guillotine pallet loading problem. We introduce a new class of schedules by analogy with the guillotine restriction for cutting stock problem and show that many well-known algorithms from classical scheduling theory construct schedules only from this class. We also consider two multiprocessor scheduling problems and prove that they can be solved in polynomial time. Copyright Springer-Verlag Berlin Heidelberg 1999
Keywords: Key words: Greedy algorithm; guillotine cutting stock; multiprocessor scheduling; packing; pallet loading (search for similar items in EconPapers)
Date: 1999
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://hdl.handle.net/10.1007/PL00020925 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mathme:v:50:y:1999:i:1:p:27-51
Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/00186
DOI: 10.1007/PL00020925
Access Statistics for this article
Mathematical Methods of Operations Research is currently edited by Oliver Stein
More articles in Mathematical Methods of Operations Research from Springer, Gesellschaft für Operations Research (GOR), Nederlands Genootschap voor Besliskunde (NGB)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().