Geotechnical risk evaluation of tunneling projects using optimization techniques (case study: the second part of Emamzade Hashem tunnel)

Reza Mikaeil, Sina Shaffiee Haghshenas () and Zoheir Sedaghati
Additional contact information
Reza Mikaeil: Urmia University of Technology
Sina Shaffiee Haghshenas: Islamic Azad University
Zoheir Sedaghati: Urmia University of Technology

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, 2019, vol. 97, issue 3, No 7, 1099-1113

Abstract: Abstract Tunneling projects are generally complex projects with numerous affective factors, including variable and unreliable conditions of the land. One of the appropriate tools for conducting a successful project is the implementation of risk management during its lifetime. The clustering of tunneling risks is an effective part of risk management. The research aims to achieve an optimization risk assessment based on clustering techniques in the projects which are faced with deep drillings. Hence, in this study, with contribution of the field study and use of failure modes and effects analysis results, the seven geological sections in the path of the second part of Emamzade Hashem tunnel are considered. In these seven sections, the area of instability around the tunnel, groundwater inflows and squeezing are used in the risk assessment as analysis criteria. The clustering of risks is determined by meta-heuristic algorithms such as particle swarm optimization based on stochastic optimization technique and Fuzzy C-means clustering approach as optimization techniques. The Emamzade Hashem tunnel is located in the north of Iran. The present study in the second part of Emamzade Hashem tunnel on Haraz road, one of the longest road tunneling projects in Iran, shows that results are in full compliance with soft computing results. It was found that the performance of the intelligent modelings had significant capability to evaluate the geotechnical risks of tunneling. Finally, seven sections in the path of the second part of this tunneling project were classified into two categories of the highest level and the lowest level of risk.

Keywords: Tunneling risks; Risk management; Meta-heuristic algorithms; Particle swarm optimization (PSO); Stochastic optimization; Fuzzy C-means (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)

Downloads: (external link)
http://link.springer.com/10.1007/s11069-019-03688-z Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:nathaz:v:97:y:2019:i:3:d:10.1007_s11069-019-03688-z

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11069

DOI: 10.1007/s11069-019-03688-z

Access Statistics for this article

Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards is currently edited by Thomas Glade, Tad S. Murty and Vladimír Schenk

More articles in Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards from Springer, International Society for the Prevention and Mitigation of Natural Hazards
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:nathaz:v:97:y:2019:i:3:d:10.1007_s11069-019-03688-z