Stochastic transitions of a mixed-integer linear programming model for the construction supply chain: chance-constrained programming and two-stage programming
Aspasia Koutsokosta () and
Stefanos Katsavounis ()
Additional contact information
Aspasia Koutsokosta: Democritus University of Thrace
Stefanos Katsavounis: Democritus University of Thrace
Operational Research, 2024, vol. 24, issue 3, No 12, 57 pages
Abstract:
Abstract This paper addresses the problem of optimal Construction Supply Chain (CSC) design and integration in deterministic and stochastic environments by providing a family of models for the optimization of a dynamic, multi-product, multi-site contractor-led CSC. With the objective of minimizing the total CSC cost, optimal decisions are made on network design, production, inventory holding and transportation, while also considering discounts for bulk purchases, logistics centers, on-site shortages and an inventory-preparation phase. The models integrate the operations of temporal and project-based supply chains into a sustainable network with repetitive flows, large scope contracts and economies of scale to provide the main contractor with a versatile optimization framework which can account for different levels of uncertainty. The novelty of this paper lies in providing a flexible integrative optimization CSC tool that accounts for multiple CSC actors (suppliers and/or logistics centers), projects, products, time periods, operations, and different decision-making environments depending on the nature of the problem and the risk-attitude of the decision maker. This paper contributes to the fast-growing research field of stochastic CSC optimization showcasing stochastic transitions of a mixed-integer linear programming model to chance-constrained programming and two-stage programming and incorporating uncertainties with different types of probability distributions or scenarios, and even interdependent uncertainties—approaches that have not been explored extensively in the CSC context. The results reveal that the stochastic approaches sacrifice the minimum cost of deterministic solutions having average settings to obtain robust well-hedged solutions over the possible parameter variations and that the selection of a suitable method for modeling uncertainty is context-dependent.
Keywords: Construction supply chain management; Construction supply chain network design and integration; Stochastic optimization; Mixed-integer linear programming; Chance-constrained programming; Two-stage programming (search for similar items in EconPapers)
Date: 2024
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://link.springer.com/10.1007/s12351-024-00856-3 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:operea:v:24:y:2024:i:3:d:10.1007_s12351-024-00856-3
Ordering information: This journal article can be ordered from
https://www.springer ... search/journal/12351
DOI: 10.1007/s12351-024-00856-3
Access Statistics for this article
Operational Research is currently edited by Nikolaos F. Matsatsinis, John Psarras and Constantin Zopounidis
More articles in Operational Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().