Scheduling with Fuzzy Methods
Wolfgang Anthony Eiden ()
Additional contact information
Wolfgang Anthony Eiden: Darmstadt University of Technology
A chapter in Operations Research Proceedings 2004, 2005, pp 377-384 from Springer
Abstract:
Abstract Nowadays, manufacturing industries — driven by fierce competition and rising customer requirements — are forced to produce a broader range of individual products of rising quality at the same (or preferably lower) cost. Meeting these demands implies an even more complex production process and thus also an appropriately increasing request to its scheduling. Aggravatingly, vagueness of scheduling parameters — such as times and conditions — are often inherent in the production process. In addition, the search for an optimal schedule normally leads to very difficult problems (NP-hard problems in the complexity theoretical sense), which cannot be solved efficiently. With the intent to minimize these problems, the introduced heuristic method combines standard scheduling methods with fuzzy methods to get a nearly optimal schedule within an appropriate time considering vagueness adequately.
Date: 2005
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-540-27679-1_47
Ordering information: This item can be ordered from
http://www.springer.com/9783540276791
DOI: 10.1007/3-540-27679-3_47
Access Statistics for this chapter
More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().