Priority-Rule Methods for Project Scheduling with Work Content Constraints

Cord-Ulrich Fündeling ()
Additional contact information
Cord-Ulrich Fündeling: Universität Bern

A chapter in Operations Research Proceedings 2006, 2007, pp 529-534 from Springer

Abstract: Abstract In many practical applications of resource-constrained project scheduling a work content (e.g., in man months) is specified for each activity instead of a fixed duration and fixed resource requirements. In this case, the resource usages of the activities may vary over time. The problem then consists in determining the resource usage of each activity at each point in time such that precedence constraints, resource scarcity, and specific constraints on the evolution over time of resource usages are respected and the project duration is minimized. We present two priority-rule methods for this problem and report on results of an experimental performance analysis for instances with up to 200 activities.

Date: 2007
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-540-69995-8_84

Ordering information: This item can be ordered from
http://www.springer.com/9783540699958

DOI: 10.1007/978-3-540-69995-8_84

Access Statistics for this chapter

More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:oprchp:978-3-540-69995-8_84