On a multi-project staffing problem with heterogeneously skilled workers
Matthias Walter () and
Jürgen Zimmermann ()
Additional contact information
Matthias Walter: Clausthal University of Technology
Jürgen Zimmermann: Clausthal University of Technology
A chapter in Operations Research Proceedings 2011, 2012, pp 489-494 from Springer
Abstract:
Abstract We examine a workforce assignment problem arising in the multi-project environment of companies. For a given set of workers and for a given set of projects, we want to find one team of workers for each project that is able to satisfy the project workload during each period of project execution. The aim is to minimize average team size. We outline two mixed integer linear programming (MIP) formulations and introduce two heuristic approaches to this problem. A numerical study indicates the performance of the approaches and provides managerial insights into flexibility issues.
Keywords: Mixed Integer Linear Programming; Roulette Wheel Selection; Mixed Integer Linear Programming Model; Mixed Integer Linear Programming Formulation; Warehouse Location (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:oprchp:978-3-642-29210-1_78
Ordering information: This item can be ordered from
http://www.springer.com/9783642292101
DOI: 10.1007/978-3-642-29210-1_78
Access Statistics for this chapter
More chapters in Operations Research Proceedings from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().