EconPapers    
Economics at your fingertips  
 

Design Comparison Between One- and Two-Sided S2 Control Charts with Estimated Parameter

Felipe S. Jardim (), Martin G. C. Sarmiento, Subhabrata Chakraborti and Eugenio Kahn Epprecht
Additional contact information
Felipe S. Jardim: PUC-Rio
Martin G. C. Sarmiento: PUC-Rio
Subhabrata Chakraborti: University of Alabama
Eugenio Kahn Epprecht: PUC-Rio

Chapter Chapter 74 in Operations Management for Social Good, 2020, pp 753-760 from Springer

Abstract: Abstract The S2 (or S2) chart is one of the most useful tools in Operations Management (OM) for monitoring process variability. Previous studies on this chart with estimated variance did not compare their one- and two-sided designs. We make this comparison, revealing the large performance difference between them and providing new insights for the users.

Keywords: Parameter estimation; S2 chart performance; Average run length (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:prbchp:978-3-030-23816-2_74

Ordering information: This item can be ordered from
http://www.springer.com/9783030238162

DOI: 10.1007/978-3-030-23816-2_74

Access Statistics for this chapter

More chapters in Springer Proceedings in Business and Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:prbchp:978-3-030-23816-2_74