Conclusions and Future Work
Sachin Karadgi ()
Additional contact information
Sachin Karadgi: University of Siegen
Chapter Chapter 6 in A Reference Architecture for Real-Time Performance Measurement, 2014, pp 125-127 from Springer
Abstract:
Abstract Manufacturing enterprises are facing increasing pressure from the internal and external environments to realize and sustain their competitive advantage. Subsequently, monitoring and control of manufacturing processes is crucial. In this regard, performance measurement within and across different enterprise levels is indispensable. Thus, operational metrics are critical for the employees on the shop floor where as the financial metrics are indispensable for top management.
Keywords: Operational Metrics; Carbon Footprint; Tracking Object; Financial Metrics; Shop Floor (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:prochp:978-3-319-07007-0_6
Ordering information: This item can be ordered from
http://www.springer.com/9783319070070
DOI: 10.1007/978-3-319-07007-0_6
Access Statistics for this chapter
More chapters in Progress in IS from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().