EconPapers    
Economics at your fingertips  
 

One Station Assembly

Nick T. Thomopoulos ()
Additional contact information
Nick T. Thomopoulos: Illinois Institute of Technology

Chapter Chapter 10 in Assembly Line Planning and Control, 2014, pp 105-114 from Springer

Abstract: Abstract One station assembly is described in the context of a shoe manufacturing plant where one worker is assigned a set of shoes by style and size to assemble all alone. The worker is given a batch of the items to produce, and is provided all the parts and components needed to complete the task. Multiple pairs are assigned to the worker; typically six to twelve pair at one time. The worker completes all the pairs in the batch prior to starting the next assignment. This is an example of one-station assembly. In other situations, the workers are assigned one unit at a time, as in engine assembly.

Keywords: Station Assembly; Utilization Ratio; Current Inventory; Part Requirement; Average Service Time (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-319-01399-2_10

Ordering information: This item can be ordered from
http://www.springer.com/9783319013992

DOI: 10.1007/978-3-319-01399-2_10

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:sprchp:978-3-319-01399-2_10