EconPapers    
Economics at your fingertips  
 

Production Planning with Common Parts in Closed-Loop Supply Chains

Jenny Steinborn (), Grit Walther () and Thomas S. Spengler ()
Additional contact information
Jenny Steinborn: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig
Grit Walther: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig
Thomas S. Spengler: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig

Chapter 10 in Operations Research Proceedings 2008, 2009, pp 59-64 from Springer

Abstract: Summary Common parts in different product variants can lead to decreased procurement costs if recovery strategies are applied. Thereby new parts are substituted by recovered ones. Since long- or mid-term supplier contracts for these new parts exist demand as well as return forecasts are essentially to negotiate contracts. In this article forecasting issues are addressed and a planning procedure to calculate the need of new parts is given.

Keywords: Production Planning; Product Variant; Recovery Strategy; Common Part; Spot Market (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-00142-0_10

Ordering information: This item can be ordered from
http://www.springer.com/9783642001420

DOI: 10.1007/978-3-642-00142-0_10

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2026-05-31
Handle: RePEc:spr:sprchp:978-3-642-00142-0_10