Production Planning with Common Parts in Closed-Loop Supply Chains
Jenny Steinborn (),
Grit Walther () and
Thomas S. Spengler ()
Additional contact information
Jenny Steinborn: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig
Grit Walther: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig
Thomas S. Spengler: Institut füur Produktion und Logistik, Technische Universitäat Braunschweig
Chapter 10 in Operations Research Proceedings 2008, 2009, pp 59-64 from Springer
Abstract:
Summary Common parts in different product variants can lead to decreased procurement costs if recovery strategies are applied. Thereby new parts are substituted by recovered ones. Since long- or mid-term supplier contracts for these new parts exist demand as well as return forecasts are essentially to negotiate contracts. In this article forecasting issues are addressed and a planning procedure to calculate the need of new parts is given.
Keywords: Production Planning; Product Variant; Recovery Strategy; Common Part; Spot Market (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-00142-0_10
Ordering information: This item can be ordered from
http://www.springer.com/9783642001420
DOI: 10.1007/978-3-642-00142-0_10
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().