Production Chain Planning in the Automotive Industry
Claas Hemig () and
Jüurgen Zimmermann ()
Additional contact information
Claas Hemig: Clausthal University of Technology, Institute of Management and Economics, Operations Research Group
Jüurgen Zimmermann: Clausthal University of Technology, Institute of Management and Economics, Operations Research Group
Chapter 13 in Operations Research Proceedings 2008, 2009, pp 79-84 from Springer
Abstract:
Summary We allocate a given production workload between L production lines producing P products with a subsequent buffer of limited capacity by modeling the problem as a classical transportation problem. The model is embedded in a Dynamic Programming approach that finds a cost-optimal solution exploiting the given exibility of an automotive plant with respect to production capacity, production volume and staff. Preliminary computational results show that our approach solves real-world instances within some hours.
Keywords: Demand Node; Approximate Dynamic Program; Shift Model; Paint Shop; Body Shop (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-00142-0_13
Ordering information: This item can be ordered from
http://www.springer.com/9783642001420
DOI: 10.1007/978-3-642-00142-0_13
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().