EconPapers    
Economics at your fingertips  
 

Life Cycle of a Project

Bernd-J. Madauss

Chapter 4 in Project Management, 2024, pp 97-126 from Springer

Abstract: Abstract Projects run in individual phases that must be logically coordinated. At the beginning, the project objective must be clearly defined and the end of the life cycle is determined by the specified end result. To prevent problems, it is important that the rules of a logical process are followed. Especially the early phases play an important role, because in them the plans for the realization are created. Mistakes made in the early phases often have a major impact on the expensive subsequent phases. The life cycle, which is divided into phases, is the basis for determining the life cycle costs (LCC).

Date: 2024
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-662-69057-4_4

Ordering information: This item can be ordered from
http://www.springer.com/9783662690574

DOI: 10.1007/978-3-662-69057-4_4

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:sprchp:978-3-662-69057-4_4