Deterministic Project Scheduling with No Resource Constraints
Gündüz Ulusoy and
Öncü Hazır
Additional contact information
Gündüz Ulusoy: Sabancı University
Öncü Hazır: Rennes School of Business
Chapter Chapter 4 in An Introduction to Project Modeling and Planning, 2021, pp 101-140 from Springer
Abstract:
Abstract Project schedules, which are the basic components of project plans, specify when activities are to be performed and constitute the basis for allocating the resources to activities. In this chapter we use mathematical modeling to formulate and solve scheduling problems for single and multiple project settings. In this framework, we relax the resource constraints, and assume all problem parameters are known with certainty. To introduce the basic deterministic scheduling models we discuss the critical path method, defining the different types of slacks presenting algorithms to calculate them. Mathematical models to optimize financial objectives are presented. Finally, a case study is given where a work breakdown structure is created, and a baseline schedule is constructed for a real-life problem.
Keywords: Project Scheduling; Critical Path Method; Total Slack; Free Slack; Net Present Value (search for similar items in EconPapers)
Date: 2021
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sptchp:978-3-030-61423-2_4
Ordering information: This item can be ordered from
http://www.springer.com/9783030614232
DOI: 10.1007/978-3-030-61423-2_4
Access Statistics for this chapter
More chapters in Springer Texts in Business and Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().