Production Planning and Scheduling
Hartmut Stadtler ()
Additional contact information
Hartmut Stadtler: University of Hamburg
Chapter 10 in Supply Chain Management and Advanced Planning, 2015, pp 195-211 from Springer
Abstract:
Abstract Assuming APS module Production Planning APS module Scheduling Production Planning and Scheduling that the master plan has been generated, we can now derive detailed plans for the different plants and production units. In the following we will describe the underlying decision situation (Sect. 10.1) and outline how to proceed from a model to a solution (Sect. 10.2). Some of these steps will be presented in greater detail, namely model building (Sect. 10.3) and updating a production schedule (Sect. 10.4). Whether Production Planning and Scheduling should be done by a single planning level or by a two-level planning hierarchy largely depends on the production type of the shop floor. This issue will be discussed together with limitations of solution methods in Sect. 10.5.
Keywords: Setup Time; Production Planning; Production Schedule; Shop Floor; Feasible Schedule (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sptchp:978-3-642-55309-7_10
Ordering information: This item can be ordered from
http://www.springer.com/9783642553097
DOI: 10.1007/978-3-642-55309-7_10
Access Statistics for this chapter
More chapters in Springer Texts in Business and Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().