Using an incentive-compatibility due-date quotation to improve the performance for one-of-a-kind production shop floors controlled by load-based pull systems
Guodong Huang and
Yacob Khojasteh
International Journal of Production Research, 2024, vol. 62, issue 4, 1072-1091
Abstract:
For one-of-a-kind production (OKP) manufacturers adopting an engineer-to-order or make-to-order marketing strategy, it is very important to set an appropriate due date. We design an incentive-compatibility due-date quotation procedure to help OKP manufacturers obtain the rational due-date quotation from OKP customers. Based on the rational due-date quotation decision-making, the performance of an OKP shop floor controlled by load-based pull systems is evaluated in simulation. Our findings show that if the collaboration of due-date quotations and load-based pull control is effective, the order profit of OKP manufacturers will not be reduced when the delivery delay occurs. This study can provide more insights on order quotation decision-making and pull production control for OKP manufacturers.
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2023.2175308 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:62:y:2024:i:4:p:1072-1091
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2023.2175308
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().