Due date quoting and rescheduling in a fixed production sequence
Herbert Jodlbauer and
Shailesh Tripathi
International Journal of Production Research, 2024, vol. 62, issue 4, 1206-1220
Abstract:
In this article, the due date setting problem consisting of due date quoting, order insertion and rescheduling with relevant sequence-dependent setups and a frozen zone is considered. A differential equation model is introduced. The differential equation can be solved analytically and requires low computing effort. Explicit expressions are gained concerning the earliest possible due date (due date quoting problem) and the latest possible insertion position (rescheduling problem) in order to meet the customer requested due date. The differential equation model is compared with an approach based on a recently introduced hybrid binomial inverse hypergeometric probability distribution for the due date quoting problem. The analytical results of the proposed model are very close to the expectation values (these cannot be explicitly calculated, and high computation effort is required) of the recently introduced approach.
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2023.2179342 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:62:y:2024:i:4:p:1206-1220
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2023.2179342
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().