EconPapers    
Economics at your fingertips  
 

A common due-date assignment problem with job rejection on parallel uniform machines

Gur Mosheiov and Assaf Sarig

International Journal of Production Research, 2024, vol. 62, issue 6, 2083-2092

Abstract: We study a common due-date assignment problem on two parallel uniform machines. The jobs are assumed to have identical processing times, and job-dependent and asymmetric earliness and tardiness unit costs. The scheduler may process only a subset of the jobs, i.e. the option of job-rejection is allowed. The objective function consists of three cost components: the total earliness-tardiness cost of all scheduled jobs, the cost of the common due-date, and total rejection cost. For a given number of rejected jobs and a given due-date, the problem is reduced to a non-standard linear assignment problem. Consequently, the optimal solution is shown to be obtained in polynomial time in the number of jobs. The case of a given (possibly restrictive) due-date, the extension to a setting of more than two machines, and a number of special cases, are also discussed.

Date: 2024
References: Add references at CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2023.2217277 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:62:y:2024:i:6:p:2083-2092

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20

DOI: 10.1080/00207543.2023.2217277

Access Statistics for this article

International Journal of Production Research is currently edited by Professor A. Dolgui

More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:tprsxx:v:62:y:2024:i:6:p:2083-2092