Causes of Budget Changes in Building Construction Projects: An Empirical Study in Taiwan
Jyh-Bin Yang and
Chien-Chung Chen
The Engineering Economist, 2015, vol. 60, issue 1, 1-21
Abstract:
Most contractors pay close attention to managing costs due to the direct impacts of cost overruns on their profits. Contractors often cannot effectively control the costs of a construction project due to inaccurate budget allocation, resulting in unsuccessfully forecasting project profits or losses until the project's completion. This study analyzed three real cases and utilized a questionnaire survey to identify the main causes of budget changes in building construction projects in Taiwan. Research results reveal that “client changes,” “inaccurately estimated quantities,” and “unclear drawings and specifications” are the main causes of budget changes. These results provide not only a means of correcting the causes of inaccurate budget allocation but also a measure for project managers to review and control their project costs, which is important to a contractor during a low-profit era.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2013.879972 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:60:y:2015:i:1:p:1-21
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2013.879972
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().