Optimizing the capital rationing decision with uncertain returns
Liuqing Mai and
Haitao Li
The Engineering Economist, 2016, vol. 61, issue 2, 128-143
Abstract:
In this article, we develop a new optimization model for capital rationing with uncertain project returns. Our model maximizes the probability of meeting a predefined target return by selecting a feasible set of projects subject to budget constraints in multiple time periods. We employ a mixed-integer nonlinear algorithm recently developed in the optimization field to solve the resulting nonconvex optimization problem to optimality. Our model and solution methods are tested and validated through a comprehensive computational experiment. Several managerial insights are obtained about the impact of available budget and target return on the optimal solutions. Notably, we have found that increasing target return may not necessarily result in an increase in optimal total expected return of the selected projects. Our model and solution method offer a unified and computationally tractable approach to precisely quantify the tradeoff between project returned and risk.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2016.1152420 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:61:y:2016:i:2:p:128-143
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2016.1152420
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().