Supply contracts for critical and strategic materials of high volatility and their ramifications for supply chains
K. Jo Min,
Laura Lilienkamp,
John Jackman and
Chung-Hsiao Wang
The Engineering Economist, 2020, vol. 65, issue 4, 266-287
Abstract:
For critical and strategic materials such as a rare earth element or crude oil, we study a supply chain consisting of an intermediary/producer facing a highly volatile market to its customers and a local supplier at a different region subject to a fixed term supply contract. By viewing the opportunity to sign this contract as a real option, we construct a supply contract model and analytically derive the optimal contract-signing threshold price from the intermediary/producer perspective. Based on this threshold, we show how the relationship among the threshold price, lead time, and contract duration results in a classification of the supply chain’s preferences for lead time length, and to concrete guidelines for using the lead time and contract duration as tradable negotiation tools for supply chain contracts.
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2020.1712508 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:65:y:2020:i:4:p:266-287
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2020.1712508
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().