Supply chain cost management approach utilizing time-driven activity-based costing
Jailson dos Santos Silva and
Maria Silene Alexandre Leite
The Engineering Economist, 2025, vol. 70, issue 3, 101-121
Abstract:
This study focuses on cost and supply chain management models, specifically Time-Driven Activity-based Costing (TDABC) and the Lambert, Cooper, and Pagh (LCP) model. By utilizing these models to evaluate the mining supply chain, the researchers were able to examine operational details and effectively apply TDABC. The study revealed the unit cost of the product under analysis and opportunities for cost reduction through the integration of TDABC and the LCP model. The study’s originality lies in proposing an efficient cost management approach for complex organizational structures.
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2025.2540271 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:70:y:2025:i:3:p:101-121
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2025.2540271
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().